Restoring the lower Wharfe
Two kilometres of straightened, concrete-lined channel returned to gravel, meander and willow, upstream of a town that has flooded three times in nine years.
Taking concrete out of riverbanks, putting gravel and willow back, and measuring what returns.
Two kilometres of straightened, concrete-lined channel returned to gravel, meander and willow, upstream of a town that has flooded three times in nine years.
Four hundred tonnes of washed gravel, placed by hand where the salmon used to spawn, and a count each autumn to see whether they come back.
One obsolete weir, removed. Thirty-one kilometres of river reconnected for eel, lamprey and trout that have not been able to pass it since 1954.
Funded and finished: 1,800 willow and alder whips planted along two kilometres of bank to drop summer water temperatures by up to three degrees.